色婷婷五月综合亚洲小说-亚洲精品蜜桃久久久久久-亚洲欧美日韩精品久久-国精品午夜福利视频不卡757

當(dāng)前位置:首頁-新聞資訊

鋁單板的安裝方法及注意事項(xiàng)

來源:http://www.gdjsdtc.com/ 發(fā)布時(shí)間:2021-02-01

一、安裝方法
1、 Installation method
1、根據(jù)要求的水平高度拉好水平線,縱橫垂直均需拉好;
1. The horizontal line should be drawn according to the required horizontal height, and the vertical and horizontal lines should be drawn well;
2、按合適的間距吊裝輕鋼龍骨(38或50的龍骨),一般間距1-1.2米,吊桿距離按輕鋼龍骨的規(guī)定分布;
2. The light steel keel (38 or 50 keel) shall be hoisted according to the appropriate spacing, with the general spacing of 1-1.2m. The suspender distance shall be distributed according to the provisions of the light steel keel;

鋁板生產(chǎn)廠家
3、安裝方通時(shí)一定要帶手套,如不慎留下指印或污漬,可用洗潔精開水洗后抹干即可;
3. When installing Fangtong, you must wear gloves. If you leave fingerprints or stains, you can use detergent and boiled water to wash them and then wipe them dry;
4、把預(yù)裝在龍骨上吊件,連同方通龍骨裝在輕鋼龍骨下面,方通龍骨間距一般為1米,全部裝完后一定要調(diào)整至水平;
4. Install the pre installed hanging parts on the keel together with the square keel under the light steel keel. The distance between the square keel is generally 1 meter, and it must be adjusted to the level after all installation;
5、將鋁單板/木紋鋁單板/鋁單板吊頂系列按順序扣掛在龍骨上,再將倒鎖片壓下,方通端頭應(yīng)保持0mm或20mm的距離。
5. The aluminum veneer / wood grain aluminum veneer / aluminum veneer ceiling series shall be hung on the keel in sequence, and then the inverted lock piece shall be pressed down. The end of the square pass shall be kept at a distance of 0 mm or 20 mm.
二、鋁單板安裝主要注意事項(xiàng):
2、 Main precautions for aluminum veneer installation:
1.在運(yùn)送時(shí)要輕拿輕放,猛力撞擊后會(huì)使鋁單板的邊角及其版面受損,從而影響施工,也浪費(fèi)錢財(cái)。
1. Handle with care when transporting. The corners and layout of the aluminum veneer will be damaged after the impact, which will affect the construction and waste money.
2.鋁單板安裝過程中也要注意保護(hù)板面,不要以板面接觸地面,以免劃傷裝飾面。
2. During the installation of aluminum veneer, attention should be paid to the protection of the panel surface. Do not touch the floor with the panel surface to avoid scratching the decorative surface.
3.鋁單板的品種、質(zhì)量、顏色、花型、線條應(yīng)符合設(shè)計(jì)要求,并應(yīng)有產(chǎn)品合格證。
3. The variety, quality, color, pattern and line of aluminum veneer shall meet the design requirements, and the product certificate shall be provided.
4.幕墻墻體骨架如采用型鋼龍骨時(shí),其規(guī)格、形狀應(yīng)符合設(shè)計(jì)要求,并應(yīng)進(jìn)行除銹、防銹處理。
4. If section steel keel is used for curtain wall skeleton, its specification and shape shall meet the design requirements, and rust removal and anti rust treatment shall be carried out.
5.鋁單板安裝,當(dāng)設(shè)計(jì)無特殊要求時(shí),盡量采用抽芯鋁鉚釘,中間一定要墊橡膠圈。抽芯鉚釘間距應(yīng)控制在100-150mm內(nèi)。
5. For the installation of aluminum veneer, when there are no special requirements in the design, aluminum rivet with core pulling shall be used as far as possible, and rubber ring shall be padded in the middle. The space between blind rivets shall be controlled within 100-150 mm.
6.在鋁單板安裝完成后,注意一定要在3天后撕去保護(hù)膜,時(shí)間過久會(huì)難以撕掉,還會(huì)在撕掉后影響美觀。
6. After the installation of aluminum veneer, pay attention to tear off the protective film after 3 days. If the time is too long, it will be difficult to tear off and affect the appearance.

主站蜘蛛池模板: 老鲁夜夜老鲁| 久久久久99精品国产片| 人妻av中文字幕无码专区| 女人18毛片a级毛片嫰阝| 国产乱码精品一区三上| 玩弄人妻少妇精品视频| 奶头好大揉着好爽视频| 亚洲av无码专区国产乱码4se| 亚洲国产精品久久人人爱| 男男gay啪啪网站18禁| 国产无人区二卡三卡四卡不见星空| 国产ww久久久久久久久久| 小鲜肉自慰网站| 国产又爽又黄无码无遮挡在线观看 | 亚洲综合精品伊人久久| 一区二区狠狠色丁香久久婷婷| 色偷偷www8888| 日本少妇高潮喷水xxxxxxx| 亚洲精品无码专区久久久| 老色鬼久久亚洲av综合| 无码人妻丰满熟妇啪啪网站| 亚洲精品久久久www小说| 我把护士日出了白浆| 亚洲天堂2017无码| 天堂а√在线最新版中文| 69综合精品国产二区无码| 国产精品v欧美精品v日韩精品| 亚洲精品456在线播放| 高清偷自拍第1页| 窝窝人体色www| 国产精品日韩欧美一区二区三区 | 久久人人爽天天玩人人妻精品 | 99999久久久久久亚洲| 香蕉成人伊视频在线观看 | 国产午夜福利短视频| 青青草原国产av福利网站| 亚洲欧美日韩国产精品一区二区| 久久精品人妻一区二区三区| 久久国产精品-国产精品| 色综合久久久久久久久久| 国产精品禁18久久久夂久|